Friday, March 26, 2010

PPAP Requirments...

2.2.1 Design Record
2.2.2 Authorized Engineering Change Documents
2.2.3 Customer Engineering Approval
2.2.4 DFMEA
2.2.5 Process Flow Diagram
2.2.6 PFMEA
2.2.7 Control Plan
2.2.8 Measurement System Analysis
2.2.9 Dimensional Results
2.2.10 Records Of Material / Perforamance Test Results
2.2.11 Initial Process Studies
2.2.12 Quality Laboratory Documentation
2.2.13 Appearance Approval Report
2.2.14 Sample Production Parts
2.2.15 Master Sample
2.2.16 Checking Aids
2.2.17 Customer Specific Requirements
2.2.18 Parts Submission Warrant

1 comment:

  1. Good web site! I really love how it is easy on my eyes and the data are well written. I am wondering how I could be notified when a new post has been made. I’ve subscribed to your RSS feed which must do the trick! Have a great day!

    PPAP

    ReplyDelete